Silicon Graphics Altix 350 Quick Start Manual page 18

Table of Contents

Advertisement

1: SGI Altix 350 Quick Start Guide
10
4. From the L1 prompt enter the command "cfg"
This should return a list of all the modules in the system.
001-L2>cfg
L2 137.38.68.26: - 001 (LOCAL)
L1 137.38.68.26:0:0
L1 137.38.68.26:0:1
L1 137.38.68.26:0:5
001c04-L1>
5. If all the modules in your system are not seen, check the NUMAlink cabling, also insure that
the L1 is powered on all modules.
6. To power up the system, enter the L1 command "pwr u"
001c01-L1>pwr u
001c01-L1>
7. When the L1 prompt returns, enter a "cntrl d" to break in to the console.
This will show the output of the power on boot process.
This will get you to a EFI SHELL prompt.
- 001c01
- 001c03
- 001c05
007-4417-001

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Altix 350 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents