Download Print this page

Operating Instructions - IMER WORKMAN 350 II Manual Instruction And Parts List

Multimixer
Hide thumbs Also See for WORKMAN 350 II:

Advertisement

OPERATING INSTRUCTIONS

1. Before starting the engine read the Honda manual provided and become familiar with the GX160
powerplant. Especially important is to check the oil level daily and change it monthly. Additionally,
cleaning the air filter weekly ensures consistently good performance.
2. Operate the the Workman II 350 on a level surface. For additional stability the telescopic foot stands
can be lowered and locked into place.
3. To put the drum in the loading position rotate the dump wheel until the desired drum position is
achieved.
4. Start the engine and set the throttle at 3/4 to full on.
5. Now add 1/2 of the water which will be required and then begin to add the cement and aggregates.
Additional water can be added as the cement and aggregates mix together.
BE CAREFUL ! Do Not put your shovel or your hands inside the drum !
6. To put the drum in the discharge position rotate the dump wheel untill the desired drum position
is achieved.
7. During the loading, mixing, and discharge cycle it is important to keep the mixer running at all times.
8. Always prepare your work site to have a level ground surface, the Mixer must be stable as you load and
discharge the drum.
IMER U.S.A. Inc.
WORKMAN 350 II MULTIMIXER
- 7 -

Advertisement

loading

This manual is also suitable for:

1105855