Download Print this page

Assembly - IMER WORKMAN 350 II Manual Instruction And Parts List

Multimixer
Hide thumbs Also See for WORKMAN 350 II:

Advertisement

Essentially the Workman 350 II is fully assembled and ready to operate when it leaves the assembly
facility here at Imer U.S.A. However, there are a couple items which should always be checked before
towing the Workman 350 II.
1. Make sure each tire is inflated to 50 PSI (cold), and check the oil level of the Honda motor.
2. Make certain the retractable stability legs are raised up fully and locked in place with the anchor
pin provided.
3. Make certain that the tow bar is properly anchored and its tow chain is in place. It is also important
to loop the tow chain around the tow bar several times before connecting it to a vehicle.
4. Make sure the engine canopy door is latched shut.
5. Make certain that the hitch system on your car or truck is compatible to the tow bar tongue.
6. Finally, local laws and ordinances vary from state to state regarding the registration of towable
construction equipment, check and see if a license plate is required. Call your local Department of
Motor Vehicles for the proper procedure to follow.
NOTE
State law may also require a tail light assembly.
Check with your local Department of Motor Vehicles for the proper procedure to follow.
IMER U.S.A. Inc.
WORKMAN 350 II MULTIMIXER

ASSEMBLY

+
TOWING
- 4 -

Advertisement

loading

This manual is also suitable for:

1105855