Page 1
Mirage Dental Delivery Unit Model 2.0 Installation Instructions 851 S. Lawson St. City Of Industry, CA 91748 P626-810-4337 Fax 626-810-4245 www.tpcdental.com...
Table on Contents: Page GENERAL INFORMATION Unpacking and Inventory Installation and coordination Optional Cuspidor Installation Cuspidor Plumbing Connections Junction Box Connections Post Mount Utility Center Adjustments Pressure Adjustments / Tension Screws Delivery Head / Tilt Adjustments Tubing / Connections Floor Template www.tpcdental.com...
4. Separate Junction box. For use with chairs that don’t have an integrated pump cover / junction box. • Junction box cover • Junction box frame. • If at any time you have questions regarding your installation please don’t hesitate to contact TPC toll free @ 800-560-8222 or via E- mail @ service@tpcdental.com www.tpcdental.com...
Page 4
Installation Instructions 1. Locate the four mounting bolts that were included with your dental chair adaptor. Secure bracket as shown in the image below. This installation will vary with different char manufactures. 2. Leveling Chair bracket. • The chair bracket has a total of 8 set screws. •...
Page 5
3. Loosen the 8 leveling set screws, and then place the PMU (Post mount utility center) in the cup of the chair bracket. Figure 3.1 Center the mounting post in the cup. Also verify if the PMU is aligned straight with dental chair armrest. Figure 3.1 4.
Page 6
5. Remove the PMU side cover. To remove it, pull on the lower lip to detach its magnetic connection. Place it out of the way so it does not get damaged. This side cover will remain detached until the end of the installation. 6.
Page 7
7. Remove the cosmetic rings from the side box figure 7.1. Place the cosmetic over the end of the delivery unit flex arm Figure 7.2. Once in place, route all lines and feed them through the bushing assembly shown in figure 7.3. Verify that the arm seats completely down on the bushing assembly.
Page 8
9. Tubing connections in Post mount utility center. • Orange from umbilical to Orange in flex arm. Signal Air return from master switch. • Black from umbilical to black in flex arm. Return signal air from master control. • Small Grey from foot control to clear tubing in flex arm. Water relay signal air. •...
Page 9
10. Installing assistance side touch pad. Remove the 5 screws that secure the covers together Figure 10.1. Open the assistance holder and remove the 4 additional screws that attach the bottom of the holder to the support frame in figure 10.2. Route the touchpad wire as shown in figure Attach the touchpad bracket shown in figure 10.3.
Page 10
13. Install the operatory light onto light post. Ref operatory light installation manual for specific installation instructions for your setup. Connect the power cable from the LED light wire harness to the terminal bus bar in the side box. Figure 13.1shows the terminal bus bar.
Optional Cuspidor Installation 15. To installing the optional cuspidor, remove the Cuspidor housing cover shown in figure 15.1. Loosen the locking screw shown in figure 15.2. Route tubing’s into the mounting hub and slide the cuspidor into place Figure 15.3. Once the cuspidor is seated, tighten the fastening screw in figure 15.2.
Cuspidor Plumbing Connections 17. Connect the drain line and vent line from the cuspidor to the Y connector fittings in Figure 18.1. You will need to cut the lines to length and then install it to the quick connect fitting on the Y connector Figure 18.2. Both lines need to be free from kinks and binding.
Page 13
Operation Instructions 1. To turn the delivery unit “ON” switch the toggle on the right side of the delivery unit head to the “ON” position. To turn the unit “OFF” toggle switch to the “OFF” position. Figure 1.1 2. To select City water or bottle water, set the toggle selector switch to the correct position. When setting the system to “bottle”...
Page 14
4. Flush Function. To perform a HP flush, Remove all three Handpieces from the delivery unit handpiece holders. Place the HP tubing’s in a bucket or container to catch the water that will be purged from the tubing’s. Use a suitable shock treatment and add to the water bottle system.
Page 15
7. The mirage 2.0 delivery unit has a water quick disconnect. This is located under the post mounted utility center. See figure 7.1 for location. www.tpcdental.com...
Junction Box Connections 20. Before making any connections in the junction box, be sure to clear the supply lines. If there is any debris in the air line it will collect on the micron filter. Verify the line is clear. 21.
Post mount utility center adjustments (PMU) 1. There are two main adjustments that can be made in the PMU. • Assistant's side syringe block adjustments Turning the screw counterclockwise will increase the air / water pressure. Turning the screw clockwise will decrease the air / water pressure. •...
Page 18
4. If you need to level the unit head or adjust the tilt use the following adjustments. • Loosen the 4 Allen screws that attach the unit head to the short control arm. See image. Once the screws are loose, use the two adjustment screws in the center on each side to level the head.
Page 19
Junction Box 1. Yellow 6 X 4 Air Supply line 2. Blue 6 X 4 Water Supply line 3. Grey Master Switch Supply 4. Yellow Master switch return 5. Purple Air brake supply 6. Red Spare Post mount utility center (from umbilical to delivery unit arm) 1.
Need help?
Do you have a question about the Mirage 2.0 and is the answer not in the manual?
Questions and answers