Download Print this page

Installation Checklist - Extron electronics Cable Cubby 1202 Installation Manual

Advertisement

Routing and Connecting Cables
Planning (page 1)
Check with local and state regulations before starting the installation.
Check all parts and equipment before installation.
Preparing the Table (page 2)
Determine the best location for the
Choose a method for cutting the hole in the table.
Preparing the Cable Cubby (page 3-5)
Assemble connectivity modules (page 3).
Install the modules (page 5).
Mounting the Cable Cubby in the Table (page 5)
Mount the Cable Cubby flush with the
Adjust the side clamps under the table.
Installing Retractors (page 7)
Routing and Connecting Cables (page 8)
For information on safety guidelines, regulatory compliances, EMI/EMF compatibility, accessibility, and related topics, see the
Extron Safety and Regulatory Compliance Guide
Worldwide Headquarters: Extron USA West, 1025 E. Ball Road, Anaheim, CA 92805, 800.633.9876
8
3
Connect cables to the AV system
and connect the AC power cord.
2
Using zip ties, secure cables to the holes
on the bottom of the Cable Cubby.
1
For cable pass-through applications,
allow at least 36 inches (0.9 m) of cable
loop for each cable.

Installation Checklist

enclosure.
table.
on the Extron website.
© 2017-2020 Extron Electronics — All rights re
All trademarks mentioned are the property of their respective owners.
CAUTION:
Risk of Electric Shock.
This equipment must be grounded.
ATTENTION :
Risque de choc électrique.
Cet équipement doit être fixé au sol.
NOTE:
Ensure that there is no tension on the power
cable.
www.extron.com
served.
68-3552-01 Rev. A
05 20

Advertisement

loading
Need help?

Need help?

Do you have a question about the Cable Cubby 1202 and is the answer not in the manual?

This manual is also suitable for:

Cable cubby 1402