Line Origination Test: Confirmation Of Physical/Telephone Stn Number; Line Termination Test: Confirmation Of Telephone Stn Number; Line Connection Test: Case Of Hot Line/House Phone Involved; 3-Party Conference Trunk Function Test (Via Fccs) - NEC NEAX 2400 IPX Manual

Fusion network
Hide thumbs Also See for NEAX 2400 IPX:
Table of Contents

Advertisement

3.3.1

Line Origination Test: Confirmation of Physical/Telephone STN Number

STEP 1: Connect the line circuit card to be tested to a telephone set in Node A (self-Node).
STEP 2: Lift the handset of STN A and confirm dial tone.
STEP 3: Place a call to an ATTCON or D
STEP 4: Answer the call and confirm the speech condition and Physical/Telephone (station) number of the
calling station.
STEP 5: Release the call.
3.3.2

Line Termination Test: Confirmation of Telephone STN Number

STEP 1: Place a call from ATTCON/D
STEP 2: Answer the call.
STEP 3: Confirm the number dialed and that the telephone number of STN A are the same on the display of
the ATTCON/D
STEP 4: Release the call.
3.3.3

Line Connection Test: Case of Hot Line/House Phone Involved

STEP 1: The Station to be tested goes off-hook and confirms ringback tone.
STEP 2: Check whether the call is routed to the predetermined station/ATTCON.
STEP 3: Answer the calls and confirm the speech condition.
STEP 4: Release the call.
Node A (Self-Node)
STN A
LC /
ELC
ine to be tested
(XXXX)

3.4 3-party Conference Trunk Function Test (via FCCS)

Perform the 3-party conference trunk function test by following the procedures below and by referring to
Figure
6-11:
term
term
in Node B using the telephone number of STN A.
term
.

Figure 6-10 Line Connection Test (origination) via FCCS

in Node B.
Node B
FCCS
NDA-24299
POST INSTALLATION TEST
FCCS Network Connection Test
ATTCON
ATI
ELC
CHAPTER 6
Page 153
Revision 1.0
Check
Check
Check
term
D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents