3.3 Rear installation
Install from bottom layer to top layer, first lock the connecting screws between the
cabinets, then fix the connecting plates with M8x60mm screws onto the square tube.
Connector Plates
M8×60 Screw Bolt
40×40 mm Square Tube
3.4 Rigging
The product also supports rigging installation, and the measured maximum load is 10
cabinets.
First, the hanging bar is fixed on the truss or steel structure by the airplane belt or steel
wire rope through the eye bolt, and please make sure the adjacent hanging bars are
connected by connecting blocks and kept on the same level.
Eye bolt
l
Connectors Block
A27 Plus
Series User Manual
- 16 -