Dehumidification guidance
How to install the screen in the case that dehumidification is necessary.
3. While installing cabinets,
• Check S-Box shows the pattern through monitor connected to S-Box service port.
• After installing each cabinet, check whether the pattern is shown in it.
• OCM cable connection can be checked through this.
• Before turning off S-Box, turn off the cabinets, first.
• After being sure S-Box plays this pattern, turn on the cabinets.
4. After completing installation of cabinets, start 24hr dehumidification process.
5. After finishing 24hr dehumidification process, do edge correction and module calibration.
– during installation
S-Box should play only this pattern.
This contents must be noticed to customer.
Please print this page and hand it to user.