9
|
Electrical installation
9.3.6 To connect the electricity meters
Installer reference guide
142
A
B
B
3 Fix the cable with cable ties to the cable tie mountings. General information,
see
"9.3.1 To connect the electrical wiring to the indoor
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A] Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X15M/5 and X15M/9; the negative polarity to X5M/5
and X5M/3.
1 Open the following (see
1 User interface panel
2 Switch box
3 Switch box cover
4 Top cover
2 Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
NO
14 18
M2S
X 2M
1
A
NC
13 18
X 2M
1
"7.2.4 To open the indoor
ERLA11~16DAV3+W1 + EBSH/X(B)11+16P30+50DF
B
4
unit" [
133].
4
unit" [
84]):
4
3
2
1
Daikin Altherma 3 R ECH₂O
4P663482-1B – 2022.07