INSTALL LARGE O-RING
9
into valve body. Apply food equipment
lubricant on o-ring.
INSTALL CYLINDER
10
onto valve body. Rotate cylinder
clockwise and press down firmly to
secure into slots on valve body.
INSTALL MEDIUM O-RING
11
onto discharge tube.
Apply food equipment
lubricant on o-ring.
INSTALL DISCHARGE TUBE
12
onto valve body. Rotate discharge tube
clockwise and press down firmly to
secure into slots on valve body.
INSTALL LID
13
by sliding smaller lid hole
over discharge tube.
Align center hole with
threads on cylinder.
IF DISCHARGE TUBE
HAS THREADS:
To secure lid, slide discharge tube nut
onto discharge tube.
Rotate nut clockwise to secure.
INSTALL PLUNGER ASSEMBLY
14
into pump.
Rotate locking collar clockwise
onto cylinder threads to secure.
Page 7
Need help?
Do you have a question about the CP-MEC3 and is the answer not in the manual?