Changing The Conveyor Chain: Bs 2/C-100 - Bosch rexroth BS 2/C Series Assembly Instructions Manual

Hide thumbs Also See for rexroth BS 2/C Series:
Table of Contents

Advertisement

62/84
Maintenance and repair
Please note:
Perform the steps on both
sides in parallel.
Disassembling the chain:
1.
Remove the gear motor.
2.
Disassemble the outer
protective case halves.
3.
Fix the chain tensioner
4.
Open the chain with the
3
disassembly tool
).
3
) Disassembly tool:
– for fl at top chain:
3 842 010 510
– for accumulation roller chain:
3 842 010 511
5.
Remove the drive and
return head covers.
6.
Pull the used chain down
from the BS 2/....
7.
Remove the sliding piece
from the return head.
Assembling the chain:
5
8.
Drag the new chain
to the return head
with a pull-in aid.
) BS 2/C..., BS 2/R...:
5
Observe the running
direction of the chain
Fig. 42, page 61.
Bosch Rexroth AG, MIT: BS 2/C-..., BS 2/R-..., 3 842 563 834/2022-08
10.4.17 Changing the conveyor chain: BS 2/C-100, ...-250, BS 2/R-300, ...-700,
motor mounting (MA) = R/L
2x
SW10
.
M = 8 Nm
D
BS 2/C-100
BS 2/R-300
8 981 010 511
4
)
4
3
)
8 981 010 510
Fig. 45:
Changing the conveyor chain BS 2/C-100, ...-250, BS 2/R-300, ...-700, MA = R/L (1/2)
1
BS 2/C-250
BS 2/R-700
SW4
M
= 2,5 Nm
D
3
)
4x
1
SW10
M = 8 Nm
D
6
SW4
M
= 2,5 Nm
D
3
2
7
6
8
563 833-47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents