HP HPE 3PAR StoreServ 8000 Installation Manual page 8

Table of Contents

Advertisement

Prior to delivery and installation tasks
Prior to the delivery and installation, complete the following site planning tasks :
Prepare a preliminary layout of the subsystem installation.
Review the power and the heating, ventilation, and air-conditioning (HVAC) requirements.
Order any additional support equipment indicated by the power and HVAC review.
Work with the appropriate Hewlett Packard Enterprise representative to ensure that all
system units in the specified configuration and all cables of the required length have been
ordered.
Make a final layout of the installation and review the layout with your Hewlett Packard
Enterprise representative.
Select key personnel and arrange for training with your Hewlett Packard
Enterprise representative.
Verify that the electrical service wiring has been installed at the predetermined location
before installing the system. For detailed requirements, see the respective product
specifications.
Verify that any additional support equipment is properly installed and operational.
Prior to installation tasks
Prior to installation, review the packaging to verify that no tampering of the goods has occurred.
When unpacking the equipment, verify that the delivered shipment of all the equipment is correct.
Refer to the packing slip and the SKUs with the shipment.
Complete the
Prepare the following checkpoints with your local sales representative or systems engineer:
Contact information for customer personnel and for Hewlett Packard Enterprise technical
sales, support, and service personnel
Implementation project plan
Configuration information for the system to be installed, including system configuration
diagrams
Shipping and delivery details and requirements
Management workstation, SP, and network information
Description of the environment
Volume and RAID level planning information
Additional notes and comments about installation
Current support matrix
System technical specifications
Systems Acceptance Certificate
8
General Site Planning
"System Hardware Installation Checklist" (page
13).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents