Moving The Product To The Installation Site; Installation - Orion RKS250F-S Operation Manual

Unit cooler circulation-type liquid cooler
Table of Contents

Advertisement

Moving the Product to the Installation Site

Initial Check / Moving the Product to the Installation Site
Initial Check
Upon receiving the product, check it carefully for signs of shipping-related damage (scratches, dents,
etc.). If you notice a problem, please contact your dealer.
Moving the Product to the Installation Site
1. The product is heavy; please be careful when unloading and placing it.
2. When carrying the product by its handles, watch your step, and always use 2 people.
● Installation should be carried out by your dealer or by a qualified installation engineer.
Installing this product on your own may result in water leakage, electric shock, or fire.
Installation Site
● Do not install in areas where flammable gas leaks may occur. Presence of flammable gas
around this product may result in fire.
● This product is for indoor use only. Exposure to water splash or rain could lead to electric
shock or fire, or product breakdown.
● Do not install in locations where large amounts of dust, dirt, particulate, or oil mist are floating
in the air.
● Install the product on a robust and even floor that can fully withstand its weight, and provide
protection against falling. Improper installation may lead to injury from water leakage or
overturning of product.

Installation

Installation Site
WARNING
WARNING
CAUTION
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rks400f-sRks500fRks750f

Table of Contents