Installation; Viii.1. Handling In An Upright Position; Viii.2. Lifting In Horizontal Position; Viii.3. Installation Precautions - Caladair EVERSKY 500 Installation And Commissioning Manual

Decentralised energy recovery unit
Table of Contents

Advertisement

VIII. INSTALLATION
VIII.1.
Handling in an upright position
It is recommended to handle the unit on its transport medias (1)
and to remove them at the last moment as close as possible de the
place of location.
If the equipment is handled using a forklift, take care that it
supports the load-bearing structure.
Adapt the choice of handling means to the weight of the equipment
received (refer to the weight given at the beginning of the
document).
During transport, the ports are fixed on the inside the unit to
facilitate the handling and avoid possible damage.
VIII.2.
Lifting in horizontal position
The unit must not be lifted by the fixing bracket fitted from the factory.
Avoid any shocks during lifting or ground removal that could damage the structure and the integrity of the unit.
If the unit is lifted using a crane, use a rudder and belt it to keep in a horizontal position.
Do not obstruct the opening of the side doors during the ceiling mounting of the unit.
Support areas under the central part:
Recessed from doors seals and latches
From the lower edge of the front panel to the lower edge of
the rear panel.
VIII.3.
Installation precautions
Make sure that there is no obstacle in front of the blow jet:
If the ceiling is sloping, it is recommended to install the unit on the upper part of the slope
There should be no beams perpendicular to the blow jet
If there are light fitting protruding from the ceiling, the air stream must be able to pass over the light fittings so that it is
not blocked.
MS-CDF-019 – Manufacturing Nr: 220001→
EVERSKY
Transport medias to be removed during installation
Version B
Update: 2022/06/14
13/70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eversky 750Eversky 900Eversky 1100

Table of Contents