X.2.E. Performances And Operating Limits; X.2.F. Installation Of Condensate Lift Pump - Caladair EVERSKY 500 Installation And Commissioning Manual

Decentralised energy recovery unit
Table of Contents

Advertisement

X.2.e.
Maximum length
Maximum elevation
Condensate maximum temperature
Overheating thermal protection (automatic
reset)
Anti-overflow dry contact
Power consumption

X.2.f. Installation of condensate lift pump

X.2.f.1. Preliminary checks
Beforehand, check the condensate pan and pipes for particles (metal chips, plaster/concrete debris...) that may have resulted from
the installation and transport operation and remove them to avoid pump failure.
X.2.f.2. Installation
Step
1
Remove the part of the tube that equips in standard the unit and acting for drainage by gravity.
2
Fix the pump mounting bracket to the pre-drilled wall by means of the 2 metal sheet screws.
3
Install the pump on the mounting bracket and insert the elbow sleeve into the suction connection.
MS-CDF-019 – Manufacturing Nr: 220001→
Performances and operating limits
EVERSKY
10m
5m
+35°C
+115°C
NC (Normally Closed)
8A resistive – 250Vac
14W
Description
Version B
Update: 2022/06/14
26/70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eversky 750Eversky 900Eversky 1100

Table of Contents