Viii.5.A. Attachment Of The Support To The Ceiling - Caladair EVERSKY 500 Installation And Commissioning Manual

Decentralised energy recovery unit
Table of Contents

Advertisement

VIII.5.a.
Example of unit fastening with duct connection on the back side and leaning against the wall.
Step
Remove the bracket from the top panel of the unit by
unscrewing the 4 fixing screws.
Note: the position of the bracket thus fitted at the
1
factory corresponds to the clamping position once
the un unit is leaning against the wall.
This position may refer to the prior dimensions taking
depending on the installation configuration chosen.
Check the presence of clamping nuts on the threaded
rods of the fixing support (nuts to be engaged
2
approximately 10mm after the end of the threaded
rods).
Draw 2 markers on the ceiling:
1 line 120mm from the wall to which the unit
is leaning
3
1 line perpendicular to the first above and
centered in relation to the 2 cores made in
the wall.
Align the edge of the support on the first line and
centered the frame on the second line by means of
the holes (B) acting as markers (templates plates (A)
4
can optionally be removed beforehand to facilitate
the installation of the frame and rewound
afterwards).
5
Attach the frame by means of 4 x 4 fixing holes (C).
Attach the 2 template plates on their ends by means
6
of fixing holes (D).
MS-CDF-019 – Manufacturing Nr: 220001→
Attachment of the support to the ceiling
EVERSKY
Description
Version B
Update: 2022/06/14
15/70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eversky 750Eversky 900Eversky 1100

Table of Contents