True UES900 Owner's Manual page 18

Table of Contents

Advertisement

CHAPTER 2: ASSEMBLY INSTRUCTIONS
BIKE ASSEMBLY STEPS (continued):
Step #4 Front Mast Cable Routing:
a) Pull the cable bundle coming from the base
of the unit through the front mast using the
pull tie provided with the mast.
Step #5 Front Mast:
a) For each screw, install through split washer
then flat washer
b) Insert the Front Mast onto exposed bike
frame U-bracket; pay special attention not to
pinch any wires between the Front Mast and
the frame
c) Verify that the Front Mast is in the correct
orientation
d) Secure the Front Mast to the bike frame by
tightening all 6 screws with the provided hex
wrench
e) Verify that the Front Mast is secured tightly
to the bike frame; tighten screws if necessary
Hardware Required:
6 M8 x 20 Screws
6 M8 Washers
6 M8 Spring Washers
Truefitness.com / 800.426.6570 / 636.272.7100
Pull Tie
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es900

Table of Contents