Page 2
NOTICE Please retain these instructions for future reference. Firmly secure all bolts,screws and knobs before use. Reconfirm that all bolts,screws,and knobs are secure every 90 days. Fasten screws loosely during initial assembly. Do not fully tighten screws until the item is completely assembled. Do not use or store this item in the proximity of open flame or flammable/combustible chemicals.
Page 4
PARTS Right side panel Front panel Left side panel Divider panel Roof Back panel Front panel of feeder Side panel of feeder Sliding tray 2PCS...
PRODUCT ASSEMBLY Attach Part H on two sides of Part I by 4 pcs of P4 screws. Attach a Part E to Part C and Part B by 4pcs of P3 screws.
Page 7
PRODUCT ASSEMBLY ① Attach front panel Part A to two side panels by 4pcs of P2 screws. ② Attach 4pcs of P7 to the hutch leg. Screw the feeder inside to the front panel A by 2pcs of P1 screws.
Page 8
PRODUCT ASSEMBLY Slide in the tray Part G. Put the wood floor Part J and wire mesh floor Part K above the tray.
Page 9
PRODUCT ASSEMBLY Put in the divider Part D. ① Attach the roof Part E to the back panel by 6pcs of P5 screws. ② Notice to level up the hinge.
Page 10
PRODUCT ASSEMBLY Attach the roof highe P6 to the roof panel and right side panel by 4pcs of P5 screws. LOCKED OPEN...
Once the items are received, opened, and deemed to be faulty or other problems. Pls contact us at service@aivituvin.com for the solution. We will feedback to you within 24 hours. If you are happy with the shopping ,welcome to share photos and thoughts with others .
Page 12
WARNING Manufacturer and seller expressly disclaim any and all liability for personal injury,property damage or loss,whether direct,indirect,or incidental,resulting from the incorrect attachment,improper use,inadequate miantenance,or neglect of this product.
Need help?
Do you have a question about the AIR01-B and is the answer not in the manual?
Questions and answers