Summary of Contents for Strictly Beds & Bunks RipVan Day Bed Box J
Page 1
Box J Instructions 21 (Version: August 2020) www.strictlybeds.co.uk Assembly Instructions RipVan Day Bed CUSTOMER CARE We have checked all parts to ensure they are free of damage. However timber is a natural, living product. Occasionally timber can still be adjusting to humidity, for this reason a crack or stretch mark may appear after the product has been packaged.
Page 2
To ALL customers - If you have a missing or damaged bolt you can order these FREE of CHARGE using the following method, please note we will require your order number or delivery address Email: help@strictlybedsandbunks.co.uk Website: www.strictlyhelpdesk.co.uk All fixings are sent out via next day Royal Mail Post...
Page 3
TOP TIPS - TOP TIPS Read before you start assembly Locating the Dowel Rods To keep the bed from rattling all the dowel holes have been slightly mis-drilled by a couple of mm. When you push parts together the dowels will straighten and pull together to ensure a tight fit.
Page 4
How to identify your parts and fixings All our products have four attachment methods. These are colour coded, at the end of each part you will find a marker pen marking either RED, WHITE or BLUE (two types) RED MARKING/FIXINGS The part will have a red marker pen marking on the end.
Page 5
Section 1 Build The Headboards Important: When laying each corner post on the floor the white chalk mark MUST be facing you. First we need to build the left hand headboard (as standing in front of the bed). Locate the following parts and position as per the photo: White Corner post D1 - left hand side...
Page 6
Section 2- Attach Back Siderail The white chalk marks for each headboard MUST be facing inward, naturally position L to your left (D1 & 2) and R to your right (D2 & 3) The side rails are universal. Now find a side rail and attach the back one first, again using the fixings on page 4 attach.
Page 7
Now we need to attach the from side rail, again using the fixings on page 4 attach and tighten. Now we need to attach the base slats You will have twelve extra wide base slats. Push the first slat tight with the footboard corner posts, then using the base slat spacer block evenly space out the remaining base slats.
Need help?
Do you have a question about the RipVan Day Bed Box J and is the answer not in the manual?
Questions and answers