IBM G8316 Installation Manual page 43

System networking rack switch
Table of Contents

Advertisement

To install the 1U air duct option in a 19" rack, complete the following steps.
1. Loosen and remove the mounting screws from the both sides of the mounting
rail and set aside to reuse to secure the foam carrier.
Half shear
Mounting screws
2. Place the half shears on the rear side of the foam carriers and use the M3.5
mounting rail screws to secure the foam carrier assemblies snugly against the
rear of the RackSwitch unit. Torque the screws to approximately 1.1 Nm (10
inch-pounds).
Note: There are additional M3.5 screws in the air duct assembly kit.
3. Plug the power cords into their respective RackSwitch power cord connectors
and using the tie wraps, secure the power cords to the mounting rails.
Power connection
4. Use the M6 screws to secure the air duct brackets to the mounting rails. Torque
the screws to approximately 5.7 Nm +/- 0.1 Nm (50 inch-pounds).
Foam carrier snug against rear of unit
Reuse mounting screws
Power connection
Tie wraps
Chapter 2. Installing the RackSwitch and options
Tie wraps
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

80361611-16e

Table of Contents