E-Tech S06-HAE Operators Manual With Maintenance Information page 54

Table of Contents

Advertisement

Maximum slope rating, stowed position 25%,
maximum side slope rating, stowed position
25%.
Note: Slope rating is subject to ground
conditions and adequate traction.
Press the drive speed button to the fast drive
speed mode.
To determine the slope grade
Measure the slope with a digital inclinometer
OR use the following procedure.
You will need:
Carpenter's level
Straight piece of wood, at least 1 m long
Tape measure
Lay the piece of wood on the slope.
At the downhill end, lay the level on the top
edge of the piece of wood and lift the end until
the piece of wood is level.
While holding the piece of wood level,
measure the distance from the bottom of the
piece of wood to the ground.
Divide the tape measure distance (rise) by the
length of the piece of wood (run) and multiply
by 100.
Example:
Run = 3.6 m
Rise = 0.3 m
0.3 m ÷ 3.6 m = 0.083 x 100 = 8.3%
If the slope exceeds the maximum slope or
side slope rating, the machine must be
winched or transported up or down the slope.
See Transport and Lifting section.
Operation from Ground with
Controller
Maintain safe distances between operator,
machine and fixed objects.
OPERATOR'S MANUAL with Maintenance Information
Operating Instructions
Be aware of the direction the machine will
travel when using the controller.
Battery Level Indicator
Full
Use the LED readout screen to determine the
battery level.
How to use the Safety Arm
1
Raise the platform until the distance of the
two sets of scissor at least 0.5m.
2
Lift the safety arm, move it to the center of
the scissor arm and rotate up to a vertical
position.
3
Lift the upper safety arm, move it to the
center of the scissor arm and rotate down
to a vertical position. (for S1212-HAE/ACE,
S1412-HAE/ACE)
4
Lower the platform until the safety arm
rests securely on the link. Keep clear of
the safety arm when lowering the platform.
performing maintenance or repair.
unless unload the platform.
How to Fold Down the
Guardrails (JCPT0807)
The platform railing system consists of three
fold down rail section for the extension deck
and three sections for the main deck. All
sections are held in place by four wire lock
pins.
1
Fully lower the platform and retract the
49
Low
Engage all safety arms before
Don't engage the safety arm

Advertisement

Table of Contents
loading

Related Products for E-Tech S06-HAE

Table of Contents