Gree GWH09ACC-K6DNA1F/I Service Manual page 118

Hide thumbs Also See for GWH09ACC-K6DNA1F/I:
Table of Contents

Advertisement

Step
4. Remove front panel assy
Remove connection screws connecting the front panel
assy with the chassis and the motor support, and then
remove the front panel assy.
5. Remove right side plate assy
Rescrew the ground screws, remove the ground wires,
loosen the screws fixing terminal board, remove the
terminal board, rescrew the screws fixing the right
plate, and remove the right side plate assy.
6. Remove gas valve and liquid valve
Remove the valve support bolck, remove the screws
fixing the gas valve and the liquid valve,unsolder the
welding joint connecting the gas valve and the liquid
valve, remove them.
Note:
Discharge the refrigerant completely befor unsoldering;
when unsoldering, wrap the gas valve with a wet cloth
completely to avoid damage to the valve caused by
high temperature.
Installation and Maintenance
Procedure
front panel
right side plate
welding joint
liquid valve
gas valve
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents