Subscanning Unit (Installing The Scanning Optics Unit - Siemens FUJI-Reader Service Manual

Table of Contents

Advertisement

9.14 Subscanning Unit (Installing the Scanning Optics Unit)

1Y
(1) Reversing the procedures described in "9.9 Subscanning Unit (Cleaning the Light-
Collecting Mirror)," install the mirror mechanism assembly.
NOTE
Make sure that the slack of the SZ1 connector cable is not sticking out on the reflection
surface side of the light-collecting mirror. If the cable slack is sticking out on the
reflection surface side of the light-collecting mirror, secure the laser light path with
reference to the illustrations below.
F
R
O
N
T
F
R
O
N
T
009-058-00
10.20.2000 FM2732 (2)
At intervals of one year, or when 60,000 IPs have been processed
Connector cable
SZ1
GOOD
Connector cable
SZ1
CR-IR347 Service Manual
Cable clamp
Laser light path
Cable clamp
Laser light path
NG
PM - 96
Install
FR7H6931.EPS
PM - 96

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-ir347Cr-ir347p

Table of Contents