Download Print this page

NDS POWERSERVICEPSB PSB 12-40 User Manual page 23

Advertisement

Refer to the table below for a rough indication and
consult a professional installer for a safe installation.
PSB model
PSB 12-40
PSB 12-80
PSB 24-30
PSB 24-60
PSB 12/24-20
PSB 12/24-40
PSB 24/12-40
PSB 24/12-80
16.SYSTEM OPERATION CHECK
After the
operation test is required. The leisure battery must be
at 75% of the capacity, so please use the battery with
some appliances to reach the required State Of Charge.
ALTERNATOR CHARGING CHECK-UP
1. Turn off the engine.
2. Use a voltmeter to check the leisure battery voltage.
3. Check if the Dip-Switch combination for the battery
requirements (Chapter. 8) and for the alternator's
type (traditional or smart) are correct.
4. Turn on the
1 (Ref. L).
MINIMUM CABLE SECTION
l ≤ 2 m
Input/Output
16mm
/ 16mm
2
35mm
/ 35mm
2
16mm
/ 10mm
2
35mm
/ 25mm
2
25mm
/ 16mm
2
35mm
/ 16mm
2
16mm
/ 16mm
2
35mm
/ 35mm
2
POWERSERVICEPSB
POWERSERVICEPSB
2m < l ≤ 4 m
Input/Output
25mm
/ 25mm
2
2
50mm
/ 50mm
2
2
25mm
/ 16mm
2
2
50mm
/ 35mm
2
2
35mm
/ 16mm
2
2
50mm
/ 25mm
2
2
25mm
/ 25mm
2
2
50mm
/ 50mm
2
2
23
l > 4 m
Input/Output
35mm
/ 35mm
2
2
100mm
/ 100mm
2
2
35mm
/ 25mm
2
2
100mm
/ 50mm
2
2
100mm
/ 25mm
2
2
100mm
/ 35mm
2
2
35mm
/ 35mm
2
2
100mm
/ 100mm
2
2
installation, an
switch to position
2
2
2
2
2
2
2
2

Advertisement

loading