UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
Step 3 Connect signal cables. Bind cables to the cabinet nearby.
●
●
● Do not bind signal cables and power cables together.
● RS485 cables and FE cables must be shielded cables.
Figure 6-41 Installing a signal cable
Step 4 Install the SmartLi communications cable.
Issue 02 (2021-04-22)
Figure 6-40 Installing cables
(1) Ground bar in the equipment room
If you need to log in to the WebUI of the UPS monitoring system, connect the
network port on a PC to the FE port on the monitoring interface card.
If the UPS needs to connect to an external network management device,
connect the external network management device to the RS485 port on the
monitoring interface card.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
6 Installation
89