Huawei UPS5000-H-400 kVA User Manual page 78

Hide thumbs Also See for UPS5000-H-400 kVA:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
2.
3.
4.
Figure 6-10 Installing the cabinet
----End
Installation on Channel Steel
● Huawei does not provide channel steel or expansion bolts for securing channel
● Ensure that the surface of channel steel is level.
● The procedure for installation on channel steel is similar to that for installation
Issue 02 (2021-04-22)
Drill holes and install expansion sleeves.
Secure the cabinet to the floor.
Install anchor baffle plates.
NO TICE
steel. Customers need to purchase them by themselves.
on the floor except the following steps:
Determine the mounting holes for the cabinet based on the marking-off
template (for installation on channel steel).
Drill mounting holes on the channel steel using a hammer drill.
Use M12x60 bolts to secure the cabinet on the channel steel.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-h-800kva

Table of Contents