Check And Storage; Check Before Receiving; Deliverables - GE GEP5.0-3-10 User Manual

4-20kw three phase
Hide thumbs Also See for GEP5.0-3-10:
Table of Contents

Advertisement

User Manual V1.0-2022-05-10

4 Check and Storage

4�1 Check Before Receiving
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and others
signs of equipment damage. Do not unpack the package and contact the supplier as soon as
possible if any damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact
the supplier as soon as possible if any damage is found.
4�2 Deliverables
Inverter *1
PE cable OT
terminal *1
COM connector
*N
PV box mounting
PV box *1
(optional)
Expansion bolts
COM module *N
*N
Screws *N
plate *1
(optional)
connector *N
AC cable OT
PIN terminal *N
terminal *6
9
04 Check and Storage
Mounting
Screwdriver *1
plate *1
MC4 PV
Documents *1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gep10-3-au10

Table of Contents