Storage - GE GEP5.0-3-10 User Manual

4-20kw three phase
Hide thumbs Also See for GEP5.0-3-10:
Table of Contents

Advertisement

04 Check and Storage
The PV box and PV box mounting plate will be delivered when GEP15-3-10 or GEP20-3-10 is
used in Australia only.
The number of MC4 PV connectors and the PV terminals in the inverter is the same.
The type and number of the communication connector are decided by the selected
communication method.
Communication module types: WiFi, 4G, LAN, etc. The actual module delivered depends on
the communication method of the selected inverter.
The number of expansion bolts, screws, pin terminals are various depending on different
inverters. The actual accessories may differ.
4�3 Storage
If the equipment is not to be installed or used immediately, please ensure that the storage
environment meets the following requirements:
1. Do not unpack the outer package or throw the desiccant away.
2. Store the equipment in a clean place. Make sure the temperature and humidity are
appropriate and no condensation.
3. The height and direction of the stacking inverters should follow the instructions on the
packing box.
4. The inverters must be stacked with caution to prevent them from falling.
5. If the inverter has been long term stored, it should be checked by professionals before being
put into use.
NOTICE
10
User Manual V1.0-2022-05-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gep10-3-au10

Table of Contents