Check And Storage; Check Before Receiving; Deliverables; Storage - GE GEH User Manual

15-30kw three phase
Table of Contents

Advertisement

User Manual
V1.0-2023-10-30
4

Check and Storage

4�1 Check Before Receiving
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and other signs of
equipment damage. Do not unpack the package and contact the supplier as soon as possible if any
damage is found.
2. Check the inverter model. If the inverter model is not what you requested, do not unpack the
product and contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact the
supplier as soon as possible if any damage is found.
4�2 Deliverables
Connect the DC cables with the included terminals. The manufacturer shall not be liable for the
damage if other terminals are used.
The number of pin terminals, PV connectors, and battery connectors are various depending on
different inverters. The actual accessories may differ.
PV connector: GEH15-3U-10/GEH20-3U-10: 4 x PV+/PV-; GEH25-3U-10/GEH29.9-3U-10/GEH30-
3U-10: 6 x PV+/PV-.
Battery connector: GEH15-3U-10/GEH20-3U-10: 1 x BAT+/BAT-; GEH25-3U-10/GEH29.9-3U-10/
GEH30-3U-10: 2 x BAT+/BAT-.
BMS communication cable: GEH15-3U-10/GEH20-3U-10: 1; GEH25-3U-10/GEH29.9-3U-10/
GEH30-3U-10: 2; Meter communication cable GEH15-3U-10/GEH20-3U-10: 1; GEH25-3U-10/
GEH29.9-3U-10/GEH30-3U-10: 1.
WARNING
NOTICE
23
04
Check and Storage

Advertisement

Table of Contents
loading

Table of Contents