4
TRANSPORT
4.1
HANDLING & TRANSPORTING
If the machine has been placed on a pallet, it shall be handled and transported through appropriate equip-
ment provided with forks. The machine transport and handling shall be carried out in compliance with
both the law in force and the regulations concerning handling, transport, and hoisting of loads.
The machine, without package, shall be loaded and unloaded by means of bands, ropes, and chains prop-
erly placed on the upper attachment of the main frame.
Hoisting shall be carried out as shown in (Fig. 04).
Fig. 04
16