Packaging; Unpacking; Package Disposal - Gearmore SPEDOVATORS Operation & Service Manual

Spedovators
Table of Contents

Advertisement

3

PACKAGING

3.1

UNPACKING

Fig. 03
1
If the equipment is delivered with its package, it will be wrapped in a nylon cover and, if necessary,
placed on a pallet. (Fig. 03)
Cut both the safety band straps (Pos. 1) and the nylon sealing tape to remove the package, being careful
not to damage the machine, parts of it, and/or the accessories, if any, packed on the frame.
Remove the accessories, if any, which lay on the main frame of the equipment.
Check that the contents comply with both the order and the documents.
As for shifting and transport, see Section 4.
3.2

PACKAGE DISPOSAL

The customer is in charge of the package disposal in compliance with the law in force.
Any package component (i.e. plastic bags, polystyrene, nails, nylon, bands, and other things) constitutes
a hazard to children and MUST BE KEPT AWAY from them.
15

Advertisement

Table of Contents
loading

Table of Contents