Lamp Installation; Preparing To Install; Ul-P100 Led-P100 Ul-Cp100 Led-Cp100 Ul-Ns75/150 Installation - emaux UNDERWATER LIGHT Series Installation And Operation Manual

Table of Contents

Advertisement

5. LAMP INSTALLATION

5.1 Preparing to Install

Junction box
1) The circuit system must comply with local laws and regulations and must be carried out by suitably qualified
installers.
2) Make sure the voltage is 12V and the terminal box is at least 120cm from the poolside .
3) Upon installation, top of the light must be at least 45cm from water surface.

5.2 UL-P100 LED-P100 UL-CP100 LED-CP100 UL-NS75/150 INSTALLATION

A) Concrete Pools Installation
1 Embed the Wall Mount into the concrete wall, making sure that it is parallel to the side of the pool.(Figure 4).
)
2) Place the Mounting Plate on the concrete wall and tighten it with 4 screws. The Conduit must be next to the
Mounting Plate (Figure 5).
3) Note that the light must only be installed on a flat or concave surface.
4) Wrap extra cables behind the light to make sure it could be taken to the pool surface for future maintenance
(Figure 6).
5) Hang the light onto the Mounting Plate and tighten the screws (Figure 7).
6) The wire connections inside the terminal box must be sealed by leak-proof tapes to prevent water from leaking
into the terminal box through the cables.
DO NOT MOUNT ON:
Reverse radius
surface
Figure 4
NS75/150
P100/CP100
TP100
P5
LAMP INSTALLATION
120cm min.
Rigid conduit
Irregular or uneven surfaces
Figure 5
Water level
45cm min. from water
line to top of lens
29.6cm
6.6cm
Concrete must be cut backaround niche
to allow fora compact plaster seal
DO MOUNT ON:
Flat surface
Walls with no tighter
Radius as Viewed from top
Figure 6
Than 6 ft.
Figure 7

Advertisement

Table of Contents
loading

Table of Contents