Gas Connections - Haier HDE5000AW User Manual And Installation Instructions

Front load dryers
Hide thumbs Also See for HDE5000AW:
Table of Contents

Advertisement

Available languages

Available languages

4. Thread a U.L. approved 30 Amp power cord. NEMA 14-30 type ST or SRDT
through the strain relief.
5. Attach the green power cord ground wire to the cabinet with green ground screw.
6. Attach the green wire conductors from the dryer and the white (neutral) power cord
conductors to the brass-colored center terminal on the terminal block. Tighten the screw
securely.
7. Attach the red and black power cord conductors to the outer brass-colored terminals on
the terminal block. Tighten the screw securely.
Warning: Do not make a sharp bend or crimp the wiring /conductor at connections.
8. Tighten the screws securing the cord restraint firmly against the power cord.
9. Tighten the strain relief nut securely so that the strain relief does not turn.
10. Reinstall the terminal block cover.

GAS CONNECTIONS

GAS Dryer
(HDG5000AW and HDG5300AW)
NOTE: DO NOT connect the dryer to L.P. gas service without converting the
gas valve. An L.P. Conversion Kit must be installed by a qualified
gas technician.
1. Remove the shipping cap from gas pipe at the rear of the dryer.
2. Connect a 1/2 inch (1.27cm) I.D. semi-rigid or approved pipe from gas supply line to
the 3/8 inch (0.96cm) pipe located on the back of the dryer. Use a 1/2 inch to 3/8
inch (1.27cm to 0.96cm) reducer for a connection. Apply an approved thread sealer
that is resistant to the corrosive action of liquified gases on all pipe connections.
3. Open the shutoff valve in the gas supply line.
4. Test all connections by brushing on a soapy water solution. NEVER TEST FOR GAS
LEAKS WITH AN OPEN FLAME.
5. Connect the exhaust duct to the outside exhaust system. Use duct tape to seal all joints.
6. With the dryer in its final position, adjust one or more of the legs until the dryer is resting
solid on all four legs. Place a level on top of the dryer. THE DRYER MUST BE LEVEL
AND RESTING SOLID ON ALL FOUR LEGS.
7. Plug the power cord into a grounded outlet.
NOTE: check to ensure power is OFF at circuit breaker/fuse box before plugging
the power cord into the outlet.
8. Turn on the power at the circuit breaker/fuse box.
CAUTION
9. Run the dryer through a cycle check for proper operation.
NOTE: On gas dryers, before the burner will light, it is necessary for the gas line to be
bled of air. If the burner does not light within 45 seconds the first time the dryer is
turned on, the safety switch will shut the burner off. If this happens, turn the dryer to
"OFF" and wait 5 minutes before making another attempt to light.
NOTE: Follow instructons supplied with kit.
Before operating the dryer, make sure the dryer area is clean and
free from combustible materials, gasoline, and other flammable
vapors. Also see that nothing (such as boxes, clothing, etc.) obstructs
the flow of combustion and ventilation air through the louvered
panel located on the rear of the dryer.
English
22

Advertisement

Table of Contents
loading

Table of Contents