Flex DD 2G 10.8-EC Operating Instructions Manual page 24

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 15
1. Assemble the tool head (drill chuck,
angle attachment, bit holder
attachment).
2. Insert the battery.
3. Insert the tool (drill bits, srewdriver bits,
bit holders).
4. Set operating mode according to the
work item (PD ... only).
5. Set torque preselection to the required
setting.
6. Set speed to the required setting.
7. Set the required direction of rotation.
8. Hold the power tool with one hand on
the handle and assume the working
position.
If the power tool is running, never actuate
the direction preselector switch or torque
setting turning dial.
9. Switch on the power tool.
At the end of work:
10. Release the trigger switch.
11. Move the direction preselector
switch (2) to the middle position.
24
DD 2G 10.8-EC / PD 2G 10.8-EC
Charger
The CA 10.8 charger is designed to charge
FLEX batteries of the following types
– AP 10.8/2.5,
– AP 10.8/4.0 and
– AP 10.8/6.0.
1
Insertion slot for battery
2
Contacts
3
LED fault message (red)
4
LED charge status (green)
5
Ventilation slots
6
Power cord with mains plug
Displays of LED
red
green
off
flashes Battery is charging.
Charging process finished.
off
on
Maintenance charging.
See "Charging process".
Battery is too hot or too
flashes
off
cold.
on
off
Battery or charger is faulty.
See "Fault messages".
Charging process
CAUTION!
Insert only original batteries in the supplied
charger.
 Insert the charger mains plug.
The LED fault message and the LED
charge status light up for a short time.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pd 2g 10.8-ec

Table of Contents