Buffer Tanks; Hydraulic System - Graco BetaCell 241D Operation

Metering unit
Table of Contents

Advertisement

Buffer tanks

• Fill the tank jackets to the mid point of the sight gage with a 50% water
Heated Jacket
• Slowly pressurize each tank to 60 psi while checking for any leaks.
Tanks

Hydraulic System

• Service the reservoir with 8 gallons of approved hydraulic oil.
• Charge the accumulator to 1200 psi.
• Determine that the manual unloading valve is fully closed.
and Glycol mixture.
77

Advertisement

Table of Contents
loading

Table of Contents