Buffer tanks
• Fill the tank jackets to the mid point of the sight gage with a 50% water
Heated Jacket
• Slowly pressurize each tank to 60 psi while checking for any leaks.
Tanks
Hydraulic System
• Service the reservoir with 8 gallons of approved hydraulic oil.
• Charge the accumulator to 1200 psi.
• Determine that the manual unloading valve is fully closed.
and Glycol mixture.
77