ABB HT568005 Operation Manual page 124

Table of Contents

Advertisement

NOTICE
Tightening torques for
screws (61044) [Nm]
with spiral-wound gasket
Tightening torques for
screws (61044) [Nm]
without spiral-wound gas-
ket
Checking the tightening
torque
© Copyright 2016 ABB. All rights reserved.
Disassembly and assembly
Dismantling and fitting nozzle ring at
turbine end
Tighten screws (61044) in accordance with following procedure and in
following order:
Segment connection
Begin with two middle screws of individual segments and then contin-
ue outwards alternately.
Screw tightening sequence
The screw positioning numbers must be marked on the component.
This enables simple and efficient tightening.
Tightening
Step 1
Step 2
Step 3
Tightening
Step 1
Step 3
Beginning with screw 1, tighten all screws in a clockwise direction with
tightening torque from step 3.
Remove lifting gear from gas inlet casing (51001).
Connect cleaning pipe (if present) and attach insulation to gas inlet
casing (51001).
Operation Manual / TPL76-C
8
8.8
TPL76-C
Screw in all screws hand-tight
140
280
TPL76-C
Screw in all screws hand-tight
280
Page 122

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl76-c35

Table of Contents