EN
LH200 IN USE
PREPARATION
Before using the LH200, calculate how
long the rope needs to be to reach the
required lifting height. The required rope
length is calculated as follows:
Rope length
= Lifting height + (ratio x lifting height)
In case of ratios of 1:1 (LH200 without a
hoist) e.g. at least 10 m + (1 x 10 m) =
20 m rope is required for a lifting height
of 10 m.
Übersetzung 1:1
Übersetzung 2:1
Ratio 1:1
Ratio 2:1
Seillänge = 2 x H
Seillänge = 3 x H
In case of ratios of 2:1 (LH200 with a 2:1
Rope length = 2 x H
Rope length = 3 x H
hoist) e.g. at least 10 m + (2 x 10 m) =
30 m rope is required for a lifting height
of 10 m.
ATTENTION:
If possible, select an anchor point that is
directly above the load. The anchor point
must be able to bear at least 500 kg.
CAUTION: RISK TO LIFE!
Select a work position for the operator
that ensures a clear line of vision to both
the load holder and the load. It is prohib-
ited to stand under suspended loads!