Starting of the machine ............3 Lubrication and Maintenance ..........4 Storage ................... 4 Ordering Spare parts .............. 4 Assembling SV-250-09SE ............5 TECHNICAL SPECIFICATIONS: Working width ............2,50 mtr/8’2” Transport width ............. 3,00 mtr/9’8” Working speed, max ......8-13 km/h / 5-8 miles/h Power requirement ..........
The machine is mounted with 4 pieces V-belts, which is tightened from Fransgård, but need to be checked before operation otherwise retighten (picture 2). Mounting on the tractor The swath Wilter SV-250-09SE is mounted on the tractors three point hitch and the PTO is mounted after this.
Picture 3 Starting the machine The machine is lowered on the wheels (picture 3) which is adjusted to the needed raking height. Fine adjustment of raking height is done on the top link. The support leg is raised. By spreading the band will be lifted by the hydraulic.
(picture 8) in each side for lifting and storage. Ordering spare parts When you order spare parts please inform the following: Type of machine SV-250-09SE and serial no. Spare part number, maybe dimension and number of parts. - 4 -...
Assembly and user guide for escalator unit on SV-250-09SE Assembly guide 1. Screws and nuts etc. are placed on the right spots. 2. The two tube brackets must be fixed into the brackets just above the wheels on the main frame, please note there is a right and left bracket.
Need help?
Do you have a question about the SV-250-09SE and is the answer not in the manual?
Questions and answers