Page 1
1 PC Wrench For technical assistance or replacement parts call Sunjoy Monday through Friday from 8:30 AM to 5:30 PM ET at following: US 1-866-578-0101 or e-mail: service@ferro-works.com. NOTE: Please read instructions prior to assembly. It is recommended to use two people for assembly.
Page 2
NOTE: Gently set parts on a flat, non-abrasive surface. Verify there are no missing parts. Assembly Diagram: Step 1: Attach Foot Plate (F) to Bridge Rail (A) with 4 Bolts (e) and 4 Flat Washers (f). See Fig. 1-1. Repeat for the other 3 Bridge Rail Posts.
Page 3
Step 4: Attach Bridge Surface (B) to Middle Rail (D) and Side Rail Step 5: Attach Decorative Top (E) to Bridge Rail (A) with Bolt (C) with Flat Washer (c), Spring Washer (b) and Bolt (a). Do (e) and Flat Washer (f). See Fig. 5. Tighten all bridge bolts not fully tighten hardware.
Need help?
Do you have a question about the L-BG011PST-1 and is the answer not in the manual?
Questions and answers