Supply And Disposal Through The Lower Front Panel (Only Classic E.o.s. Type 5270/100); Instructions For Breaking Out The Openings; Required Openings For Standard Installations - AGFA Classic E.O.S. Installation Planning

Hide thumbs Also See for Classic E.O.S.:
Table of Contents

Advertisement

DD+DIS303.03E
8.2
8.2.1
TYPE 5270/100
8.2.2
TYPE 5270/100
Edition 6, Revision 0
Supply and disposal through the lower front panel
(only Classic E.O.S. Type 5270/100)

Instructions for breaking out the openings

• It is not necessary to remove
the front panel in order to
break out the openings.
• Mark the recesses to be
broken out with a felt-tip
marker.
• The material can be broken
out by holding a screwdriver
against he groove and hitting it
with a hammer.

Required openings for standard installations

(A)
Exhaust connection
(B)
Developer overflow / drain
(C)
Fixer overflow / drain 1
(D)
Water overflow / drain
(E)
Safety overflow, tanks
(F)
Developer supply
(G)
Fixer 2 supply
(H)
Water supply
Classic E.O.S. / Classic E.O.S. CL
(Type 5270 / 100 / 105)
Installation Planning
Figure 14
E
D
C
B
A
Figure 15
527303nm.cdr
F
G
H
5273_10002_004.cdr
Chapter 14 / 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Classic e.o.s. cl5270/1005270/105

Table of Contents