Initial Installation; Downrod Mounting - Home Depot CFN-1053 Instruction Manual

Table of Contents

Advertisement

Ceiling Mounting Bracket
Step 1. Pass the 120V supply wires through the center hole in the ceiling mounting
bracket.
Step 2. Secure the ceiling mounting bracket to the outlet box with the provided mounting
screws or bolts and spring or star washers.
Downrod
Canopy Cover
Hitch Pin
Downrod

INITIAL INSTALLATION

Outlet Box
Hook

DOWNROD MOUNTING

Canopy
Canopy Cover
Bolt
Retaining Clip
Mounting Screws/Bolts
120V Wires
Step 1. Remove the hitch and lock pins. Loosen
the pre-installed bolts on the top of the
motor assembly.
Step 2. Slip the canopy, canopy cover, and
coupling cover onto the downrod. Feed
the lead wires from the fan motor through
the downrod. Install the downrod onto the
coupling.
Step 3. Insert the hitch pin through the downrod
and then re-install the retaining clip.
Retighten the bolts.
Step 4. Place the downrod ball into the ceiling
mounting bracket socket. Rotate the
entire assembly until the tab has dropped
into its slot and sits firmly. The entire
motor assembly should not rotate (left or
right) when seated properly.
Failure to reattach the hitch pin and/or properly
seat the downrod can cause the fan to fall from
the ceiling during operation.
DO NOT use the fan before ensuring it is
properly secured and the motor can no
longer rotate.
5
Washers

Advertisement

Table of Contents
loading

Table of Contents