Boiler Fixing - Riello RDB2.2 15-21 Installation, Use And Maintenance Instructions

Kerosene burners
Hide thumbs Also See for RDB2.2 15-21:
Table of Contents

Advertisement

Available languages

Available languages

5.6

Boiler fixing

E9095
Installation
1
Fig. 6
5
1
13
Provide an adequate lifting system of the burner.
 Put on the flange 1)(Fig. 6) the screw and two nuts.
 Fix the flange 1)(Fig. 7) to the boiler door 4) using screws 2)
and (if necessary) the nuts 3) interposing the insulating gas-
ket 5).
The seal between burner and boiler must be
airtight.
WARNING
4
2
GB
3
E9094
Fig. 7
2903104