Wiring And Setting Up - Xpelair 93005AW Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
E
G1

Wiring and setting up

DETAIL A
HIGH
SCALE 2.000
SPEED
SET JUMPER TO REQUIRED
POSITION FOR SPEED SETTING
DX100R / DX100S
DX11PR/DX100PS
SEE DETAIL C
LEVEL LINE
LOW
SPEED
SEE DETAIL B
CUSTOMER
CONNECTION
TERMINAL
F
IMPORTANT – PLEASE READ
Adjusting the humidity setting
Fan switches on
at lower level of
condensation
(anti-clockwise)
MORE SENTITIVE
(RH = 50%)
Factory settings:
Timer 15 minutes, RH 75%
Adjusting the run on timer setting
Fan runs on for a
shorter time when
the external switch
is turned off
Minimum 30 seconds
SEE DETAIL A
LEVEL LINE
HIGH
SPEED
LOW
SPEED
SET JUMPER TO REQUIRED
POSITION FOR SPEED SETTING
DETAIL C
SCALE 2.000
DX100TR / DX100TS
Fan does not
switch on until
higher level of
condensation
(clockwise)
LESS SENTITIVE
(RH = 95%)
Fan runs on for a
longer time when
the external switch
is turned off
Maximum 30 minutes
CUSTOMER
CONNECTION
TERMINAL
DETAIL B
SCALE 2.000
OVER-RUN
TIMER

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents