Warnings!

Watch out for the scratches that may be caused by the cabinet, chassis or rails.
Be aware of electric shock when installing the servers into the cabinet in use.
For servers of 4U form factor or higher, at least 4 people are needed for installation.
DO NOT block the vents on the server during installation, especially the vents on the front
and rear of the server.
Remove the protective film from the chassis before installing servers into the rack.
For proper ventilation, leave a minimum space of 15cm between two servers.
For easy access of the front and rear ports and cabling, leave a minimum space of 70mm
between the front side of the server and the inner side of the cabinet's front door, and
150mm between the rear side of the server and the inner side ofthe cabinet's rear door.
Always keep the air ba es in place to ensure proper air flow and avoid air turbulence in the
server room.
Installation must comply with local and regional electrical regulations. To reduce the risk of
personalinjury, fire, or damage to the server, DO NOT overload the AC supply that provides
power to the rack.
Servers can only be deployed in dedicated cabinets with ventilation holes or specialized
cooling cabinets to avoid server failure from overheating as they are high power appliances.
In case of multiple-server deployment, always load from bottom to top and place the heavier
server on the lower bay.
DO NOT install devices beyond the cabinet's load-bearing capacity, power supply capacity
and heat dissipation capacity.
For devices ≥ 15kg, it requires at least 2 people.
15kg
For devices ≥ 30kg, it requires at least 3 people.
30kg
For devices ≥ 50kg, it requires at least 4 people.
50kg
Please keep this document for future reference.
X01500A000000000
Rack-Mounted Server
Installation Guide
V1.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the i48M6 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Inspur i48M6

  • Page 1 Warnings! Watch out for the scratches that may be caused by the cabinet, chassis or rails. Be aware of electric shock when installing the servers into the cabinet in use. X01500A000000000 ● For servers of 4U form factor or higher, at least 4 people are needed for installation. ●...
  • Page 2 Rack-Mounted Server Installation Guide V1.0 Installing the Server The rails are applicable for square-hole (9.2*9.2 mm, 9.5*9.5mm) and 3.Install the two floating nuts into the post holes above the rear end of the round-hole (Ø 7.1mm) racks. rail. Hold the stopper, and then insert and tighten the two M5x8 Phillips 1.Install the lifting handles.

Table of Contents