Installing Stemi Carrier And Microscope Body; Installing The Cold Light Source - Zeiss Floor Stand S Operating Manual

Table of Contents

Advertisement

Available languages

Available languages

Floor Stand S
3.1
Installing Stemi carrier and
microscope body
Loosen the clamping lever (Fig. 5/1) on the
tilting head Fig. 5/2).
Align the tilting head (Fig. 5/2) vertically or set
in desired angular position, then re-tighten
the clamping lever.
The angular position of the clamping
lever (Fig. 5/1) can be set to a position
that is convenient for the clamping
procedure. To this end, pull the lever
until it comes out of the click stop and
turn it into the desired angular position.
After
releasing
automatically snap in again by a spring
mechanism.
Unscrew the end piece (Fig. 5/5) from the
tilting head (Fig. 5/2).
Slip the Stemi mount (Fig. 5/4) from the
bottom over the tilting head and secure it in
the desired position by means of the star knob
(Fig. 5/3).
Screw the end piece back into tilting head.
Screw the light guide holder (for optic fiber) (Fig. 5/7) with 3 mm Allen screw (Fig. 5/8) onto the
Stemi mount.
Push the optic fiber end (Fig. 5/10) into the hole on the light guide holder (Fig. 5/7) and clamp it on
the metal sleeve (10 mm diameter) using the head screw. Please note: do not clamp onto the flexible
hose.
Pull the focusing optics (Fig. 5/11) up to the stop on the optic fiber and screw it in.
Insert the microscope body, e.g. Stemi 508 (Fig. 5/9), into the mounting hole of the Stemi carrier
and fix using the clamping screw (Fig. 5/6).
If present, screw front optics in the microscope body.
If the focusing drive of the Stemi mount drops unintentionally, the torque of the focusing drive
must be adjusted to the weight of the microscope. To do this, rotate the left and right focus
drive in opposite directions.
3.2

Installing the cold light source

Position the fiberoptic light source on the console for cold light sources as shown in Fig. 6.
To adapt light guide and power cord to the light source, as well as for switch-on and operation,
please observe the separate user manual of the cold light source.
01/2017
FIRST-TIME SET-UP

Installing Stemi carrier and microscope body

the
lever,
it
will
435413-7144-010
Fig. 5
Installing Stemi carrier and microscope
body
ZEISS
13

Advertisement

Chapters

Table of Contents
loading

Table of Contents