First-Time Set-Up - Zeiss Floor Stand S Operating Manual

Table of Contents

Advertisement

Available languages

Available languages

ZEISS
3

FIRST-TIME SET-UP

Floor Stand S (if ordered, including built-in optic fiber/light guide) will be installed and set up by ZEISS
Service or a specialist named by ZEISS.
If available, the microscope, Stemi mount column 32 and cold light source will also be installed and
connected. These may also be subsequently mounted by the customer (see below).
The following operational requirements must be met before using the device each time:
− The connection parts are properly seated.
− The screws are securely tightened.
During installation of microscope components and accessories take care that the maximum
lifting capacity at the suspension arm of Floor Stand S is not exceeded (see warning
"Maximum load"). Otherwise, there is a risk of personal injury or property damage, since the
suspension arm may move downward unintentional.
The weight of tilting head and Stemi mount must be taken into account!
There is a risk of pinching fingers between the points marked with the sign "Risk of
pinching". Do not touch these points while Floor Stand S or it's parts are being moved.
To move the Floor Stand S to another place, observe Section Relocation and transport on
page 20. Secure the stand base using it's wheel stops! Otherwise, Floor Stand S may roll
away and lead to personal injury or damage to property.
12
FIRST-TIME SET-UP
Ambient conditions
435413-7144-010
Floor Stand S
01/2017

Advertisement

Chapters

Table of Contents
loading

Table of Contents