Operation; Training The Operating Personnel; Tasks; Starting To Spray With The Aircoat - WAGNER AirCoat GM 4100 AC Operating Manual

Manual gun for flat and round jet nozzles
Table of Contents

Advertisement

VERSION 01/2018
7

OPERATION

7.1

TRAINING THE OPERATING PERSONNEL

The operating personnel must be qualified to operate the entire system.
The operating personnel must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2

TASKS

Ensure that:
the regular safety checks are carried out in accordance with Chapter 8.2.3,
commissioning is carried out in accordance with Chapter 6.8.

7.2.1 STARTING TO SPRAY WITH THE AIRCOAT

1. Start up with product supply set to approx. 8 MPa; 80 bar; 1160 psi operating
pressure.
2. Spray (release locking device and pull trigger) and at the same time, observe how the
product is atomizing.
3. Set the spray pressure on the product pump to a point where good product
atomization is achieved.
4. Open the air pressure regulator for the atomizing air and adjust it so that an optimal
atomization is achieved. (The interrelation between spray pattern and atomizing air
is shown in the figure below).
5. Use the shaping air controller on the spray gun to adjust the shaping air to atomizing
air ratio, until the optimal spray pattern is achieved.
Note:
Repeat points 4 and 5 until the optimum spray pattern is reached (iterative process).
Spray pattern shapes
No atomizing
air
Note:
The flow rate can be changed by:
– changing the product pressure or
– using a different flat jet nozzle (see Chapter
ORDER NUMBER DOC 394821
Too little
atomizing air
7.4
and Chapter 13).
Correct amount
of atomizing air
B_00071
23

Advertisement

Table of Contents
loading

Table of Contents