5 Application guidelines
Calculating the consumed energy
▪ The consumed energy is calculated internally based on:
▪ The actual power input of the outdoor unit
▪ The set capacity of the backup heater
▪ The voltage
▪ Setup and configuration: To get accurate energy data, measure
the capacity (resistance measurement) and set the capacity via
the user interface for the backup heater (step 1).
Measuring the consumed energy
▪ Applicable for all models.
▪ Preferred method because of higher accuracy.
▪ Requires external power meters.
▪ Setup and configuration: When using electrical power meters, set
the number of pulses/kWh for each power meter via the user
interface.
INFORMATION
When measuring the electrical power consumption, make
sure ALL power input of the system is covered by the
electrical power meters.
5.4.3

Normal kWh rate power supply

General rule
One power meter that covers the entire system is sufficient.
Setup
Connect the power meter to X5M/5 and X5M/6.
Power meter type
In case of...
▪ Single-phase outdoor unit
▪ Backup heater supplied from a
single-phase
grid
(i.e.
the
backup heater model is *6V
connected to a single-phase
grid).
▪ Three-phase outdoor unit
▪ Backup heater supplied from a
three-phase
grid
(i.e.
the
backup heater model is *9W or
*6V connected to a three-
phase grid).
Installer reference guide
14
Use a... power meter
Single-phase
(*6V (6V): 1N~ 230 V)
Three-phase
(*6V (6T1): 3~ 230 V)
(*9W: 3N~ 400 V)
Example
Single-phase power meter
0
0
58 0
1 5 0
a
b
c
c
d
e
f
A
B
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
/N)
1
b Power meter (L
/N)
1
c Fuse (L
/N)
1
d Outdoor unit (L
/N)
1
e Indoor unit (L
/N)
1
f Backup heater (L
/N)
1
Exception
▪ You can use a second power meter if:
▪ The power range of one meter is insufficient.
▪ The electrical meter cannot easily be installed in the electrical
cabinet.
▪ 230  V and 400  V three-phase grids are combined (very
uncommon), because of technical limitations of power meters.
▪ Connection and setup:
▪ Connect the second power meter to X5M/3 and X5M/4.
▪ In the software the power consumption data of both meters is
added so you do NOT have to set which meter covers which
power consumption. You only need to set the number of pulses
of each power meter.
▪ See
"5.4.4  Preferential kWh rate power supply"  on page  14
an example with two power meters.
5.4.4

Preferential kWh rate power supply

General rule
▪ Power meter 1: Measures the outdoor unit.
▪ Power meter  2: Measures the rest (i.e. indoor unit and backup
heater).
Setup
▪ Connect power meter 1 to X5M/5 and X5M/6.
▪ Connect power meter 2 to X5M/3 and X5M/4.
Power meter types
▪ Power meter 1: Single- or three-phase power meter according to
the power supply of the outdoor unit.
▪ Power meter 2: Use a single-phase power meter.
ERGA04~08DAV3(A) + EHVZ04+08S18+23DA +
Three-phase power meter
0
0
58 0
1 5 0
a
b
  
 
c
d
e
f
g
A
B
A Outdoor unit
B Indoor unit
a Electrical cabinet (L
/L
/L
/N)
1
2
3
b Power meter (L
/L
/L
/N)
1
2
3
c Fuse (L
/L
/L
/N)
1
2
3
d Fuse (L
/N)
1
e Outdoor unit (L
/L
/L
/N)
1
2
3
f Indoor unit (L
/L
/L
/N)
1
2
3
g Backup heater (L
/L
/L
/N)
1
2
3
for
EHVZ04+08S18+23DJ
Daikin Altherma 3 R F
4P495249-1B – 2019.06

Advertisement

Table of Contents
loading

Table of Contents