Speed Changes
The Model G9933 Shaper is equipped with three
V-belt drive systems that control the speeds for
each of their respective spindles. To change spin-
dle speeds:
1.
Unplug the machine.
2.
Loosen the V-belt by following the "V-Belt
Tension" instructions.
3.
Select the desired speed. There are two
speeds for each spindle: 7000 and 10,000
R.P.M. Figure 8 shows the belt positions for
each available speed.
Figure 8. Spindle speed adjustment.
G9933 Three Spindle Shaper
4.
Align the belt along the appropriate pulley
grooves.
5.
Swing the motor back into position and tight-
en the belt as discussed in the "V-Belt
Tension" instructions.
6.
Tighten all the adjusting bolts.
7.
Spin the pulley to ensure proper tracking.
Disconnect power to the
machine when perform-
ing any adjustments or
maintenance. Failure to
do this may result in seri-
ous personal injury.
-13-