Troubleshooting; China Rohs Compliance Information (Efup Table) - Veris Industries E50 Series Installation Manual

Power monitoring
Table of Contents

Advertisement

Installation Guide
Power Monitoring
E50B1, E50C2, E50C3

Troubleshooting

China RoHS Compliance Information
(EFUP Table)
部件名称
电子线路板
O = 表示该有毒有害物质在该部件所有均质材料中的含量均在 SJ/T11363-2006 标准规定的限量要求以下.
X = 表示该有毒有害物质至少在该部件的某一均质材料中的含量超出SJ/T11363-2006标准规定的限量要求.
Z000057-0A
ZL0103-0C
Page 26 of 26
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Find Quality Products Online at:
Problem
The maintenance wrench icon
appears in the power meter display.
The display is blank after applying
control power to the meter.
The data displayed is inaccurate.
Cannot communicate with power
meter from a remote personal
computer.
产品中有毒有害物质或元素的名称及含量Substances
铅 (Pb) 汞 (Hg)
镉 (Cd)
X
O
O
©2014 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
GlobalTestSupply
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
www.
Cause
There is a problem with the
See the Alert sub-menu or the Diagnostic Alert Modbus Register
inputs to the power meter.
146
The meter is not receiving
Verify that the meter control power are receiving the required
adequate power.
voltage.
Verify that the heart icon is blinking.
Check the fuse.
Incorrect setup values
Verify the values entered for power meter setup parameters (CT
and PT ratings, system type, etc.). See the Setup section.
Incorrect voltage inputs
Check power meter voltage input terminals to verify adequate
voltage.
Power meter is wired
Check all CTs and PTs to verify correct connection to the same
improperly.
service, PT polarity, and adequate powering. See the Wiring
Diagrams section for more information.
Power meter address is incorrect. Verify that the meter is correctly addressed (see Setup section).
Power meter baud rate is
Verify that the baud rate of the meter matches that of all other
incorrect.
devices on its communications link (see Setup section).
Communications lines are
Verify the power meter communications connections (see the
improperly connected.
Communications section).
Verify the terminating resistors are properly installed on both ends
of a chain of units. Units in the middle of a chain should not have
a terminator.
Verify the shield ground is connected between all units.
六价铬 (Cr(VI))
多溴联苯(PBB)
O
.com
Solution
多溴二苯醚(PBDE)
O
O
sales@GlobalTestSupply.com
TM
09141

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E51 seriesE50b1E50c2E50c3

Table of Contents